References
United Technical Hospital Damaskus |
Syria |
Construction of a switchgear for the air conditioning- ventilation system, including installation on site. |
|
Ashughani Thermal Power Station (Wasserkraftwerk) |
Bangladesh |
Motor-Control-Center and controlling panels (40 fields) using MCC, including installation on site. | |
Schaumburger Steinbrüche |
Rinteln |
160 kW motor with transformer station 20 kV on 400 V, including complete installation. | |
Credit Suisse Moscow Ltd. |
Russia |
Building instrumentation, air conditioning system, uninterrupted power supply unit, access control, EDP wiring and installation, project engineering and video surveillance. |
|
|||||
| Credit Suisse Rep. Office Beijing | China |
Project planning including EDP-wiring and electrical installation. | ||
| Hilton Hotel | Frankfurt |
Installation of a computer-controlled lighting system for the entire facility. | ||
| SEB | Frankfurt |
Reorganisation of the current power supply of the computing centre. | ||


